Metal U-clamp template accessories for connection

Product DescriptionThe diameter of U-clip is split into 12mm and 16mm.U-clip is suitable for securing all kinds of metal form commonly used in the construction industry.Packing & DeliveryPacking Details:Package Box, Steel Pallet, Steel Frame, Container.Delivery Details:Generally it is 5-30 days, it is according to quantity.P

Featured Products

Product Description
The diameter of U-clip is split into 12mm and 16mm.
U-clip is suitable for securing all kinds of metal form commonly used in the construction industry.

Metal U Clip Formwork Accessories for Connecting
Metal U Clip Formwork Accessories for Connecting
Packing & Delivery
Packing Details:Package Box, Steel Pallet, Steel Frame, Container.
Delivery Details:Generally it is 5-30 days, it is according to quantity.
Port:Shanghai

Metal U Clip Formwork Accessories for Connecting
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Our Company
Metal U Clip Formwork Accessories for Connecting
Metal U Clip Formwork Accessories for Connecting

 

Metal U Clip Formwork Accessories for ConnectingCustomer Photos
Metal U Clip Formwork Accessories for Connecting

Metal U Clip Formwork Accessories for Connecting
FAQ
Q1:Are you trading company or manufacturer?
A:We are factory.
Q2:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D:We provide remote or on-site instruction to the builders.
Q4:Do you provide samples? is it free or extra?
A:Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
A:Structural drawing and section drawing.
Q6:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 5~7 days based on specific requirements of construction project.
Q7:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8:What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours